OTO 2000/057

Assessment of strengthening clamp from the Viking offshore platform : Phase I

The Viking AD platform was decommissioned in 1998 and one of the grouted strengthening clamps was obtained by HSE for structural integrity assessment. The objectives of the first phase of this assessment were : compilation of a visual record of the clamp and its dimensions at the end of service; assessment of marine growth, in terms of thickness, density and distribution; corrosion survey; non-destructive assessment of the grout layer between the clamp shell and the jacket tubulars; crack detection of all welds and measurement of residual stress in the vicinity of the welds of the tubulars; disassembly of one half of the clamp and measurement of stress in the studbolts. Concludes that although subject to considerable marine fouling, the clamp had suffered no significant corrosion during its 12 year immersion in seawater. The dimensions complied with the relevant "as built" drawing.

Download the PDF

Some of these research reports are very large, for information about expected download times please see our FAQs pages.

Updated 2010-03-19