Capenhurst (Sellafield Ltd) [Nuclear Site Licence 28J]

LI no. Issued Title
281 Q3/2010 Relicensing of Sellafield Limited (Capenhurst Site) to Accommodate Boundary Changes arising from land transfers

Capenhurst (Urenco UK Ltd) [Nuclear Site Licence 48D]

LI no. Issued Title
520 Q3/2010 The justification to construct a new Tails Deconversion Plant (TDP)
522 Q3/2010 The justification to construct a new Residue Recovery Facility and Effluent Treatment Plant (RRF/ETP)
518 Q3/2010 The justification for the construction of a new Cylinder Handling Facility (CHF)
N/A Q3/2010 Relicensing of Urenco UK Limited to Accommodate Boundary Changes arising from land transfers

Chapelcross [Nuclear Site Licence 15]

LI no. Issued Title
522 Q3/2010 Agreement to commence routine defuelling on Chapelcross Reactor 3

Devonport Royal Dockyard [Nuclear Site Licence 50B]

LI no. Issued Title
532 Q3/2010 Approval of emergency arrangements made under Licence Condition 11
531 Q3/2010 Agreement to implement the ISJ for the docking of HMS Trafalgar in 15 Dock

Devonshire Dock Complex (Barrow) [Nuclear Site Licence 42B]

LI no. Issued Title
508 Q4/2010 Acknowledgement of Organisational Change Proposal No.136.

Dounreay [Nuclear Site Licence 17]

LI no. Issued Title
512 Q2/2010 Agreement to commence decommissioning of a facility known as D1206/34

Dungeness B [Nuclear Site Licence 61]

LI no. Issued Title
533 Q4/2010 Approval of a Limited Increase in the Fuel Discharge Irradiation Limit for Four Stringers
527 Q3/2010 Reactor 21 Periodic Shutdown - Consent to Start-up
530 Q2/2010 Agreement to replace the existing BGOT TRTUs with new equipment

Harwell [Nuclear Site Licence 84]

LI no. Issued Title
516 Q4/2010 Consent to a lease of building 443.39 to GE Healthcare Limited
513 Q4/2010 Consent to a lease of building 443.40 to GE Healthcare Limited
511
512
Q4/2010 Sub-underlease of buildings B528.10 Unit 1, B528.11 and B528.3 to Canberra UK Limited
508 Q3/2010 Sub-underlease of B528.10 Unit 2 to Accentus Medical plc
509
510
Q3/2010 Request for Consent for Leases to Occupy Building 466 and Building 580 Harwell Science and Innovation Campus to REVISS Services UK Ltd

Heysham 1 and 2 [Nuclear Site Licence 60]

LI no. Issued Title
561 Q4/2010 Approval of increased fuel irradiation limits to allow robust fuel to be loaded into the Heysham 2 power station reactors
588 Q3/2010 Consent to start up reactor 1 following the 2010 statutory outage
560 Q3/2010 Replacement of Neutron Flux Log/Lin (High Log) Trip Group Equipment
559 Q3/2010 Permission to start up Reactor 8 following its three yearly periodic shutdown in 2010

Hinkley Point A [Nuclear Site Licence 95]

LI no. Issued Title
507 Q2/2010 Hinkley Point A site: Nuclear Site Licence Sc89 - Licence Instrument No. 507

Hinkley Point B [Nuclear Site Licence 62A]

LI no. Issued Title
531 Q4/2010 Approval of technical specification NSR 2 and 9 amendments to allow use of robust fuel at Hinkley Point B
530 Q2/2010 Justification to bring the GCE System into Operational Service at Hinkley Point B and Hunterston B

Hunterston A [Nuclear Site Licence 16]

LI no. Issued Title
509 Q2/2010 Revision to the Emergency Plan

Hunterston B [Nuclear Site Licence 13]

LI no. Issued Title
526 Q3/2010 HSE Approval of amended Technical Specification, Nuclear Safety Requirement 2.2.2, which specifies a limit on radial form factor
525 Q3/2010 Justification to bring the GCE System into Operational Service at Hinkley Point B and Hunterston B

Sellafield, Windscale and Calderhall (Sellafield Ltd) [Nuclear Site Licence 31G]

LI no. Issued Title
794 Q4/2010 A requested agreement to commence active commissioning of the Sellafield Product and Residue Store (SPRS)
755 Q4/2010 Agreement to repackaging of residues at the Residues Recovery Plant and transfer to the Finishing Plant for Storage
789 Q4/2010 Acknowledgement of safety documentation to support the implementation of a revised safety case for Thorp Receipt and Storage Pond Sluice Gates
792 Q4/2010 Acknowledgement of receipt of safety documentation for modification to an existing plant, WVP line 3 shield doors
787 Q4/2010 Agreement to proceed with a modification to an existing plant, gamma monitors replacement, WVP line 3 shield doors recovery project
784 Q4/2010 Implementation of a safety case for removal of a redundant ventilation system
777 Q4/2010 Placing of a redundant finishing line into care and maintenance and transfer of process residues into an engineered storage array
786 Q4/2010 Project Assessment Report in support of an Acknowledgement to carry out FGMSP RESPS risk reduction activities
785 Q3/2010 Formal agreement to commence active commissioning and operation of the Passive Off-Gas System in the Pile Fuel Cladding Silo (PFCS)
774 Q3/2010 Acknowledgement of receipt of the OSP for the Implementation of Phase 1 and 2
775 Q3/2010 Licence to occupy (install, maintain and operate equipment on Mast) to 'EEL'
773 Q3/2010 Request for agreement for the introduction of a safety case to reduce the potential for chronic leaks in gloveboxes to go undetected within a facility used for reprocessing Magnox fuel
779 Q3/2010 Acknowledgement of Strategy to Resolve Anomaly Identified during Commissioning of Residue Export Facility
776 Q3/2010 Implementation of Phase 2 of the B229 Continued Operations Safety Case
756 Q3/2010 Consent to Licensee granting an underlease of first floor building B1634 to Nuclear Decommissioning Authority
781 Q3/2010 Commissioning/operation of the Liquor Activity Reduction (LAR) project in the Magnox Swarf Storage Silos
780
520
Q3/2010 Approval of the combined Emergency Plan for Windscale & Sellafield Sites
782 Q2/2010 Export of Three Loaded Flasks from the Residue Export Facility
778 Q2/2010 Licence to Install and Occupy for Airwaves Solutions Limited, to install and operate equipment within a building at the Sellafield site

Sizewell B [Nuclear Site Licence 63]

LI no. Issued Title
521 Q3/2010 Justification for return to service from Forced Outage 43 (FO43)
522 Q4/2010 Temporary Suspension of Approved Operating Rule - Nuclear Safety Requirement 9.3.
523 Q4/2010 Specification of maintenance schedule preface for approval
524 Q4/2010 Phase 3 operation of the Region 2 fuel storage racks
525 Q4/2010 Specification - Long term management of intermediate level waste ion exchange resins

Springfields Fuels Ltd [Nuclear Site Licence 79]

LI no. Issued Title
514 Q4/2010 Consent to a deed of variation of lease of building A755 to Uranium Asset Management Limited and a licence to occupy building A755 in respect of Uranium Asset Management Limited to Advanced Uranium Asset Management Limited
516 Q4/2010 Consent to a licence to occupy for Westinghouse Electric UK Holdings Limited at Springfields site

Trawsfynydd [Nuclear Site Licence 81]

LI no. Issued Title
519 Q4/2010 Agreement to change the date of the decommissioning milestone for final site clearance
Trawsfynydd - Cytuno i newid dyddiad y garreg filltir o ran digomisiynu ar gyfer clirio'r safle yn derfynol

Winfrith [Nuclear Site Licence 85]

LI no. Issued Title
508 Q3/2010 Consent to lease facilities known as B75 and B752 Winfrith to INUTEC Ltd
507 Q3/2010 Consent to lease facilities known as B44, B45 and B48.1 - B48.3 - Winfrith

Wylfa [Nuclear Site Licence 58A]

LI no. Issued Title
N/A Q4/2010 Wylfa: Revalidation of periodic safety review to continue operations beyond Dec 2010
Wylfa: Ail-ddilysu adolygiad diogelwch cyfnodol i barhau i weithredu y tu hwnt i fis Rhagfyr 2010 (Welsh/Cymraeg)
544 Q3/2010 Consent to start-up Reactor 2 following the 2010 periodic shutdown
Caniatâd i ddechrau Adweithydd 2 yn dilyn cyfnod diffodd cyfnodol 2010 (Welsh/Cymraeg)
545 Q2/2010 Wylfa Power Station - Approval of amendments to an Operating Rule which covers the availability of control rods
Atomfa Wylfa - Cymeradwyo diwygiadau i Reol Weithredu sy'n cwmpasu argaeledd rhodiau rheoli
Updated 2012-09-05