Intervention reports

Intervention reports are written by our inspectors following visits to the sites we regulate. They are used to record findings and, if appropriate, any significant actions we require the site operator to carry out in order to improve matters.

Publishing executive summaries of these reports is one part of ONR’s aim to be open and transparent by helping all of our stakeholders, including the public, understand our work.

Earlier Intervention reports

Non-site specific

IR no LC no(s) Issued Title
12-088 23 January 2013 Open Exchange Meeting for EDF NGL to Update ONR on Progress with Boiler Carbon Deposition Management
12-087 23 January 2013 EDF NGL Barnwood level 4 meeting AGR Fuel Topics
12-086 N/A January 2013 Magnox - Corporate level discussions (level 4) on internal hazards work plans and issues

Dungeness A [Nuclear Site Licence 94]

IR no LC no(s) Issued Title
12-011 7, 9, 12, 26, 28 January 20123 Compliance Inspection against LC7, LC9, LC12, LC26 and LC28

Dungeness B [Nuclear Site Licence 61]

IR no LC no(s) Issued Title
12-029 23 January 2013 Planned Inspection

Hartlepool [Nuclear Site Licence 59]

IR no LC no(s) Issued Title
12-018 7, 8, 9, 12, 23, 24, 36 January 2013 Hartlepool Planned Intervention
12-017 28 January 2013 Pre - Outage Mechanical Inspection
12-015 N/A January 2013 Initial Radiological Protection Inspection prior to Reactor 2 (R2) Statutory Outage 2013
12-014 23, 27 January 2013 Licence Condition 23 (Operating Rules) Discussions with Hartlepool (HRA) on Station Specific Challenges Associated with Carbon Deposition and Inspection under LC 27 (Safety Mechanisms Devices and Circuits) of the Burst Can Detection (BCD) and Gamma Activity Monitoring (GAM) Equipment.
12-013 N/A January 2013 Meeting to discuss APEX work on Reactor 2 Outage 2013

Heysham 1 [Nuclear Site Licence 60]

IR no LC no(s) Issued Title
12-033 N/A January 2013 Review of the adequacy of the implementation of the arrangements to control the Installation, Testing and Commissioning of the Replacement of the Secondary Shutdown Guardline (SSGL) Top Dome Differential Pressure (TDDP) Trip Group Equipment (NP/SC 7524)

Hinkley Point B [Nuclear Site Licence 62A]

IR no LC no(s) Issued Title
12-026 9, 11, 27, 34 January 2013 Planned Intervention

Hunterston B [Nuclear Site Licence 13]

IR no LC no(s) Issued Title
12-032 22, 27, 28, 34 January 2013 Compliance inspection of Hunterston B

Sizewell B [Nuclear Site Licence 63]

IR no LC no(s) Issued Title
12-039 23 February 2013 Level 4 Meeting on Cycle 13 Re-Load Safety Case for SZB, Briefing on Forthcoming Increased Burn-up Safety Case for SZB and Discussion of SZB Criticality Incident Detection and Alarm System (CIDAS) Omission Safety Case
12-038 7. 17. 23. 28 January 2013 Inspection of Sizewell B Fuel Storage Pond and safety-related discussions
12-037 7, 22, 26, 37 January 2013 Planned Intervention

Wylfa [Nuclear Site Licence 58A]

IR no LC no(s) Issued Title
12-036 23, 27 January 2013 Planned Inspection into Operating Rules Governing Post-Trip Cooling at Wylfa Nuclear Power Station