Introduction

As part of the Nuclear Installations Inspectorate’s (NII) drive to increase the pace of GDA, we are placing work packages with contractors to help us carry out our detailed technical assessment of new nuclear power station designs. We established a framework agreement, including 31 Technical Support Contractors, across a range of 15 technical areas using the Official Journal of the European Union (OJEU) process.

So far, we have placed 134 work packages with a total value of £13.1m.

The contracts placed so far are as follows:

Cobham, ERA GDA Steps 3 and 4 Electrical Power Systems Technical Support 01/07/09 31/03/11
VT Nuclear Services Used Fuel Guidance Document 08/09/09 25/09/09
Jacobsen Engineering Ltd AP1000 Probabilistic Safety Analysis (PSA) assessment support for Step 3 of the GDA process 26/01/09 30/10/10
ABS Consulting Ltd Review of the EPR PCSR to Extract the External Hazards on Load Cases included in the Design 02/03/09 30/09/09
Gifford Ltd Grouted in Place Prestressing Tendon Review (EPR Design) 11/03/09 31/12/09
Atkins Nuclear Use of ETC-C in the Design of Nuclear Structures (EPR Design) 12/03/09 31/01/10
Atkins Nuclear Use of MISS 3D in the Design of Nuclear Structures (EPR Design) 12/03/09 31/10/09
Arup Review of the FE Codes used in the Design of the EPR Civil Structures 13/03/09 18/09/09
Arup Use of ETC-C in the Design of Nuclear Structures (EPR Design) 18/03/09 09/12/09
Gifford Ltd Use of ETC-Cin the Design of Nuclear Structures (EPR Design) 22/04/09 12/01/10
ERIN Engineering UK EPR PSA Support for Step 3 GDA 04/05/09 31/01/10
Arup Grouted in Place Prestressing Tendon Support/Review (EPR Design) 01/04/09 30/10/09
Serco NII Regulatory Support Programme – Regulatory Review of EPR Technical Code for Fire Protection 20/05/09 30/09/09
Lloyds Register UK EPR Level 2 PSA Risk Spectrum model review 19/06/09 30/11/09
Frazer Nash Consortium Step 3 GDA Technical Review - AP1000 & EPR: Reactor Control and Instrumentation (C&I) 16/03/09 31/12/09
National Nuclear Laboratory (NNL) Review of Information relating to Irradiation Embrittlement Aspects of Reactor Pressure Vessels and Core Support Structures 20/04/09 21/08/09
National Nuclear Laboratory (NNL) Generic Design Scoping Review of Chemistry for AP1000 and EPR 20/04/09 30/06/09
Serco Strategy document for Qualification of Manufacturing Non Destructive Testing (NDT) 27/04/09 31/07/09
Greenstreet Berman Assessment of PSA Human Reliability Analysis - AP1000 And EPR Designs 11/06/09 31/08/09
Atkins Nuclear NII Site Investigation Review – Hinkley Point B Geotechnical data 15/05/09 31/12/09
AMEC Nuclear Review of Good Practice used in PWR to Minimise Radiation Doses and Radioactive Waste (AP1000 & EPR) 08/06/09 03/07/09
Atkins Nuclear AP1000 Review of Civil Engineering Modular Construction 15/07/09 15/04/10
Gifford Ltd Review of approach for Modelling Pre-Stress in Precont and Ferrail Codes 20/07/09 21/08/09
ARUP AP1000 Civil Engineering Modular Construction 27/07/09 27/07/10
AMEC Nuclear AP1000 Civil Engineering Modular Construction 20/07/09 20/04/10
AMEC Nuclear Review of Practices used in PWRs to Minimise Radiation Doses and Radioactive Waste 20/07/09 02/11/09
Greenstreet Berman Expert Review of Human Reliability Assessment (HRA) Technical Assessment Guide (TAG) 04/08/09 11/09/09
AMEC Nuclear Preparatory Review for Assessment of the CVCS System for AP1000 10/08/09 30/10/09
Greenstreet Berman Step3 Human Factors (HF) Review 17/08/09 05/10/09
National Nuclear Laboratory (NNL) Effects of Reactor Operations and Reactor Chemistry on the stability of fuel cladding and assemblies 01/09/09 31/03/10
Hyder Consulting (UK) Ltd Regulators and Standards Bodies for Chemistry and Operator Radiation Review 07/09/09 12/02/10
National Nuclear Laboratory (NNL) Reactor Chemistry Seminars 14/09/09 12/02/10
National Nuclear Laboratory (NNL) Review of Chemical Volume and Control Systems (CVCS) 14/09/09 13/11/10
GRS Reactor Physics, Thermal Hydraulic Safety Case Support 15/10/09 15/07/10
Serco Hydrogen control 21/09/09 30/06/10
Jacobsen Engineering Procurement of 2 CAFTA & 1 FTREX Licences 01/10/09 31/12/09
Stratia Finalise Format for GDA Technical Reports 01/10/09 30/11/09
National Nuclear Laboratory (NNL) Review of Hydrogen and Corrosion 09/10/09 08/08/10
National Nuclear Laboratory(NNL) Steam Generator Tube Rupture Events 02/10/09 29/10/10
National Nuclear Laboratory (NNL) Secondary Circuit Chemistry and Materials 02/10/09 26/11/10
Serco Independent Assessment of Core Coolable Geometry 15/10/09 15/05/10
AMEC Nuclear Steam Generator Tube Rupture Events 19/10/09 27/08/10
React Engineering Ltd Design for Decommissioning 28/10/09 31/03/10
AMEC Nuclear AP1000 Fault Studies 30/10/09 04/11/09
Frazer Nash Consortium Step 4 Technical Review: Reactor GDA Control and Instrumentation 02/11/09 31/03/11
Erin Engineering UK EPR Generic Design Assessment 01/12/09 28/02/11
AMEC Fault Studies 07/12/09 21/02/10
Serco Sampling Systems 14/12/09 30/09/10
AMEC Nuclear Review for Assessment of the CVCS system for AP1000 Phase 2 23/11/09 31/07/10
Greenstreet Berman Step 4 Human Factors Support 17/12/09 31/01/11
Sandia National Laboratories EPR Containment Review 04/01/10 30/11/10
Jacobsen Engineering Ltd Step 4 GDA - Detailed Review of Systems Analysis & Seismic Analysis of AP1000 PSA (Lot 4) 10/01/10 31/07/2010
Information Systems Laboratories Inc UK EPR Ibloca Trace analysis - GDA Step 4 (Lot 5 EPR) 15/02/10 22/03/2010
AMEC Nuclear Review of LOFTRAN code & Radiological Consequences for WEC AP1000 (Lot 5) 12/01/10 31/03/2010
Hyder Consulting (UK) Ltd Minimising Radioactive Waste in UK New Build Nuclear Plants (LOT 9 - AP1000 & EPR) 29/01/10 31/05/2010
ARUP Step 4 Review of SOFiSTiK Finite Element Code used in the design of the EPR Aircraft Protection Shell Civil Structure (Lot 2 EPR) 27/01/10 30/08/2010
Gifford Ltd Assessment of inner containment design & analysis in Step 4 (Lot 2 EPR) 14/01/10 31/03/2011
ARUP Step 4 Review of the FE codes used in the design of the EPR civil structures (Lot 2 - EPR) 15/01/10 30/11/2010
ARUP Step 4 Use of ETC-C in the design of nuclear structures (Lot 2 - EPR) 15/01/10 30/11/2010
ARUP Step 4 Review of the Use of Europlexus (Lot 2 - EPR) 22/02/10 30/09/2010
ERIN Engineering UK New Civil Reactor Build Generic Design Assessment: Review of HRA Methods (Lot 13 - EPR & AP1000) 01/04/10 31/10/2010
ABS Consulting Ltd Step 4 GDA Review of the External Hazards Aspects of the EPR PCSR 01/02/10 28/02/2011
VT Nuclear Services Review of outline Radioactive Waste Management Cases Produced as part of GDA (Lot 15 AP1000 & EPR) 08/02/10 30/09/2010
National Nuclear Laboratory (NNL) Peer Review of Sampling Systems (Lot 9 AP1000 & EPR) 01/03/10 28/04/2011
Serco Secondary Circuit Chemistry and Materials Peer Review (Lot 9 AP1000 & EPR) 01/04/10 30/11/2010
Serco Severe Accident Chemistry (Lot 9 AP1000 & EPR) 01/03/10 30/11/2010
National Nuclear Laboratory (NNL) Chemistry of Severe Accidents (Lot 9 AP1000 & EPR) 26/02/10 30/11/2010
National Nuclear Laboratory (NNL) BOA (Boron Offset Anomaly) Model of Primary Circuits (Lot 9 AP1000 & EPR) 12/02/10 28/04/2011
Serco Chemistry and Primary Water Stress Corrosion Cracking (PWSCC) Review (Lot 9 AP1000 & EPR) 18/03/10 31/10/2010
Serco Containment Response and Severe Accidents GDA Step 4 – Technical Support (Lot 5 AP1000 & EPR) 20/02/10 30/01/2011
Sandia National Laboratories MELCOR (methods of leakages and consequences of releases) Confirmatory Analysis - Phase 1 26/02/10 31/08/2010
Frazer Nash Consultancy Ltd Assessment of the Westinghouse AP1000 Internal Hazards Topic Report 08/03/10 30/06/2010
Hyder Consulting (UK) Ltd Chemistry Standards (Lot 9 AP1000 & EPR) 01/03/10 30/09/2010
Bernard Whittle Process Review Board for Generic Design Assessment (GDA) 25/03/10 31/08/2010
The Business Innovation Group LLP Process Review Board for Generic Design Assessment (GDA) 25/03/10 31/08/2010
Fylde District Council Process Review Board for Generic Design Assessment (GDA) 25/03/10 31/08/2010
Serco Review of DBA Radiological Consequences Results and Methodologies 15/03/10 30/11/2010
University of Birmingham Process Review Board for Generic Design Assessment (GDA) 25/03/10 31/08/2010
AMEC Nuclear Drafting of Regulatory Observation (Lot 2 AP1000) 15/03/10 15/08/2010
National Nuclear Laboratory (NNL) Chemistry and Materials in Primary Circuits (Lot 9 AP1000 & EPR) 26/03/10 28/04/2011
Atkins Nuclear Assessment of Internal Hazards for the AP1000 (Lot 1 AP1000) 19/03/10 30/06/2010
AMEC Nuclear Start-up and Shutdown Chemistry (Lot 9 - AP1000) 15/03/10 31/10/2010
GRS Technical Review of Criticality Safety Arrangements for AP1000 & EPR Reactor Designs - WSP03 - Work Package 31 15/02/10 31/03/2010
Nuclear Technologies Technical Review of Radiogical Protection Arrangements for the Proposed AP1000 & EPR Reactor Designs (Lot 10 AP100 & EPR) 22/02/10 15/07/2010
Nuclear Technologies Technical Review of Radiogical Shielding Arrangements for the Proposed AP1000 & EPR Reactor Designs (Lot 10 AP1000 & EPR) 22/02/10 15/07/2010
Jacobsen Engineering Ltd AP1000 PSA Specialist Support to the HSE for Step 4 of the GDA (Lot 4) in 2010/2011 01/04/10 30/04/2011
Scandpower (Lloyds) Support at MDEP Meeting Regarding Risk Spectrum PSA Level 2 Questions (Lot 4 EPR) 29/03/10 30/03/2010
AMEC Nuclear Primary Circuit Chemistry and Materials (Lot 9 AP1000 & EPR) 15/03/10 30/11/2010
ABS Consulting Ltd AP1000 Load Schedule Development and External Hazards (Lot 3 AP1000) 29/03/10 28/02/2011
Atkins Nuclear Provision of services of David Gibson (Lot 1 Ap1000 & EPR) 04/05/10 31/07/2011
National Nuclear Laboratory (NNL) Start up and shut down chemistry (Lot 9 AP1000 & EPR) 01/04/10 28/04/2011
GRS Work Spec WSP02 - Reactor Physics, Thermal Hydraulic Safety Case Support to HSE ND (Lot 5 AP1000 & EPR) 15/02/10 31/05/2011
AMEC Nuclear TRACE Analysis of a 10 Inch Cold Leg Break -LOCA (Lot 5 AP1000) 29/03/10 05/09/2010
AMEC Nuclear Confirmatory Analysis of the Westinghouse AP1000 Passive Containment Cooling System (Lot 5 AP1000) 19/04/10 31/12/2010
ABS Consulting Ltd Review of Document Interface Arrangements associated with HSE’s European Pressurised Reactor Generic Design Assessment Process (Lot 2 EPR) 19/04/10 28/02/2011
AMEC Nuclear Support to HSE on AP1000 DBA Radiological Consequences Assessments - Phase 1 (Lot 5 AP1000) 20/05/10 30/11/2010
AMEC Nuclear Adding Zirlo Properties to MATARE 26/05/10 23/09/2010
AMEC Nuclear AP1000 Fault Studies - Phase 3 (Lot 5 AP1000) 07/06/10 20/11/2010
EASL Determine the Critical Defect Size in the EPR Pressuriser (Lot 12 EPR) 14/06/10 30/09/2010
Information Systems Laboratories Inc UK EPR IBLOCA TRACE ANALYSIS PHASE 2 - GDA STEP 4 01/07/10 30/11/2010
React Engineering Ltd Design for Decommissioning - Phase 2 01/07/10 31/03/2011
EASL Review of RCC-M piping design for seismic loads and fatigue 28/06/10 30/11/2010
GRS Phase 2 - Technical Review of Criticality Safety Arrangements for AP1000 Reactor Design - WSP03 - Work Package 32 (Lot 10 AP1000) 15/05/10 14/11/2010
GRS Phase 2 - Technical Review of Criticality Safety Arrangements for EPR Reactor Design (Lot 10 EPR) 15/05/10 14/11/2010
AMEC Nuclear Review of Events involving Waste & Spent Fuel (Lot 15 AP1000 & EPR) 28/06/10 20/12/2010
EASL Review of Missile Analysis from postulated failure of AP1000 Reactor Coolant Pump Flywheel (Lot 12 AP1000) 28/06/10 31/10/2010
Nuclear Technologies Technical Review of Radiological Shielding Arrangements for the Proposed AP1000 Reactor Design (Lot 10 AP1000) 01/06/10 31/12/2010
Nuclear Technologies Technical Review of Radiological Shielding Arrangements for the Proposed EPR Reactor Design (Lot 10 EPR) 01/06/10 31/12/10
Nuclear Technologies Technical Review of Radiological Protection Arrangements for the Proposed EPR Reactor Design (LOT 10 EPR) 01/06/10 31/12/10
Nuclear Technologies Technical Review of Radiological Protection Arrangements for the Proposed AP1000 Reactor Design (LOT 10 AP1000) 01/06/10 31/12/10
Atkins Nuclear Assessment of ETC-C in Step 4 - Part 2 (Lot 2 EPR) 21/06/10 30/11/10
AMTEC Consulting Process Review Board for Generic Design Assessment (GDA) 25/03/10 30/06/10
AMEC Nuclear TRACE Analysis of a 10 Inch Cold Leg Break -LOCA PHASE 2 09/08/10 30/11/10
Serco UK EPR GDA - Review of the Capability of the Proposed  EDF and AREVA UK EPR™ Reactor NDT Inspection Techniques for Pressuriser Weld (Lot 12 EPR) 03/08/10 15/11/10
Serco UK EPR GDA - Review of the Inspection Techniques for Austenitic and Dissimilar Welds (Lot 12 EPR) 06/09/10 22/10/10
Sandia National Laboratories AP1000 Technical Support on Containment (Lot 5) 19/07/10 15/12/10
Sandia National Laboratories UK EPR Technical Support on Containment (Lot 5) 19/07/10 15/12/10
ARUP Evaluation of Concept Design of the MCR for EPR France Specific Arrangements (Lot 2) 02/08/10 31/10/10
Hyder Consulting (UK) Ltd Attendance at 5 ND-TSC Liaison Meetings August 2010 to January 2011 (Lot 9 AP1000 & EPR) 01/08/10 31/01/11
Serco UK EPR GDA - Review of RCC-M Design Requirements for the Pressure Boundary of Pumps and Valves (Lot 12) 15/08/10 31/10/10
Health Protection Agency Assessment of the Westinghouse AP1000 Level 3 PSA – Part 1  (Lot 10) 09/08/10 17/11/10
Health Protection Agency Assessment of the EDF & Areva EPR Level 3 PSA – Part 1  (Lot 10) 09/08/10 17/11/10
Serco UK EPR GDA - Repairs in Cast Austenitic Pump Bowls: Assessment of Potential Radiographic and Ultrasonic Techniques (Lot 12) 20/09/10 15/11/10
AMEC Nuclear Review of ESB-CA Modules - Prof Whittaker (Lot 2 AP1000 15/09/10 20/02/11
TWI Ltd Comparison Between RCC-M & ASME Welding Requirements for the UK EPR (Lot 12 ) 09/08/10 31/10/10
EASL Determine the Critical Defect Size in the UK EPR Pressuriser (Lot 12) 16/08/10 18/12/10
AMEC Nuclear Review of ESB-CA Modules - AMEC (Lot 2 AP1000) 15/09/10 20/02/11
EASL Determine the Critical Defect Size in the UK EPR Pressure Vessel (Lot 12) 20/08/10 03/12/10
Information Systems Laboratories Inc UK EPR IBLOCA TRACE ANALYSIS PHASE 3 - GDA STEP 4 (Lot 5) 01/10/10 31/12/10
ABS Consulting Ltd AP1000 GDA PSA Containment Fragility Review. (Lot 4) 01/09/10 31/01/11
Serco Review of the changes in the Methodology for Setting Reactor Pressure Vessel Pressure Temperature Limits for UK EPR & AP1000 GDA 01/09/10 19/11/10
Jacobsen Engineering Ltd Specialist Support to the HSE for Step 4 of the GDA in 2009/2010 Review of spurious C&I Actuation faults. (Lot 4 AP1000) 15/09/10 30/11/10
Jacobsen Engineering Ltd Specialist Support to the HSE for Step 4 of the GDA  in 2009/2010 Review of the new IVR Analysis. (Lot 4 AP1000) 15/09/10 31/12/10
AMEC Nuclear Corrosion Performance of Metamic (Lot 9 AP1000) 11/10/10 12/01/11