As part of the Nuclear Installations Inspectorate’s (NII) drive to increase the pace of GDA, we are placing work packages with contractors to help us carry out our detailed technical assessment of new nuclear power station designs. We established a framework agreement, including 31 Technical Support Contractors, across a range of 15 technical areas using the Official Journal of the European Union (OJEU) process.
So far, we have placed 21 work packages with a total value of £1.8m. We expect to place more work packages over the coming months. The contracts placed so far are as follows:
| Contractor | Project title | Start date | End date |
|---|---|---|---|
| Cobham, ERA | GDA Steps 3 and 4 Electrical Power Systems Techical Support | 01/07/09 | 31/03/09 |
| VT Nuclear Services | Used Fuel Guidance Document | 08/09/09 | 25/09/09 |
| Jacobsen Engineering Ltd | AP1000 Probabalistic Safety Analysis (PSA) assessment support for Step 3 of the GDA process | 26/01/09 | 04/05/09 |
| ABS Consulting Ltd | Review of the EPR PCSR to Extract the External Hazards on Load Cases included in the Design | 02/03/09 | 02/07/09 |
| Gifford Ltd | Grouted in Place Prestressing Tendon Review (EPR Design) | 11/03/09 | 11/09/09 |
| Atkins Nuclear | Use of ETC-C in the Design of Nuclear Structures (EPR Design) | 12/03/09 | 31/01/10 |
| Atkins Nuclear | Use of MISS 3D in the Design of Nuclear Structures (EPR Design) | 12/03/09 | 31/10/09 |
| Arup | Review of the FE Codes used in the Design of the EPR Civil Structures | 13/03/09 | 18/09/09 |
| Arup | Use of ETC-C in the Design of Nuclear Structures (EPR Design) | 18/03/09 | 09/12/09 |
| Gifford Ltd | Use of ETC-C in the Design of Nuclear Structures (EPR Design) | 22/0409 | 12/01/10 |
| ERIN Engineering | UK EPR PSA Support for Step 3 GDA | 04/05/09 | 10/10/09 |
| Arup | Grouted in Place Prestressing Tendon Support/Review (EPR Design) | 01/04/09 | 30/10/09 |
| Frazer Nash Consortium | Step 3 GDA Technical Review - AP1000 & EPR: Reactor Control and Instrumentation (C&I) | 16/03/09 | 31/12/09 |
| National Nuclear Laboratory (NNL) | Review of Information relating to Irradiation Embrittlement Aspects of Reactor Pressure Vessels and Core Support Structures (CSS) for AP1000 & UK EPR Reactor Designs | 20/04/09 | 31/07/09 |
| National Nuclear Laboratory (NNL) | Generic Design Scoping Review of Chemistry for AP1000 and EPR | 20/04/09 | 30/06/09 |
| Serco | Strategy document for Qualification of Manufacturing Non Destructive Testing (NDT) | 27/04/09 | 31/07/09 |
| Greenstreet Berman | Assessment of PSA Human Reliability Analysis - AP1000 And EPR Designs | 11/06/09 | 31/08/09 |
| Serco | NII Regulatory Support Programme – Regulatory Review of EPR Technical Code for Fire protection | 20/05/09 | 31/08/09 |
| Atkins Nuclear | NII Site Investigation Review – Hinkley Point B Geotechnical data | 15/05/09 | 15/10/09 |
| Peter Scott | Review of PWR Steam Generator Tubing Materials Selection, Performance and Manufacturing Routes | 15/06/09 | 15/09/09 |
| AMEC Nuclear | Review of Good Practice used in PWR to Minimise Radiation Doses and Radioactive Waste (AP1000 & EPR) | 08/06/09 | 03/07/09 |