| GDA Issue |
GDA Issue Ref. |
Resolution Plan |
| Internal Hazards |
| Internal Fire Safety Case Substantiation |
GI-AP1000-IH-01 GDA Issue |
GI-AP1000-IH-01
Resolution Plan |
| Internal Flooding Safety Case |
GI-AP1000-IH-02 GDA Issue |
GI-AP1000-IH-02
Resolution Plan |
| Pressure Part Failure |
GI-AP1000-IH-03 GDA Issue |
GI-AP1000-IH-03
Resolution Plan |
| Internal Explosion Safety Case Substantiation |
GI-AP1000-IH-04 GDA Issue |
GI-AP1000-IH-04
Resolution Plan |
| Internal Missile Safety Case |
GI-AP1000-IH-05 GDA Issue |
GI-AP1000-IH-05
Resolution Plan |
| Substantiation and Analysis of the Consequences of Dropped Loads and Impact from Lifting Equipment Included Within the AP1000 Design |
GI-AP1000-IH-06 GDA Issue |
GI-AP1000-IH-06
Resolution Plan |
| Civil Engineering |
| Justification of Novel Form of Structure for the Steel/ Concrete Composite Walls and Floors Known as CA Modules |
GI-AP1000-CE-01 GDA Issue |
GI-AP1000-CE-01
Resolution Plan |
| Further Justification of Novel Form of Structure for Steel / Concrete Composite Wall to the Enhanced Shield Building |
GI-AP1000-CE-02 GDA Issue |
GI-AP1000-CE-02
Resolution Plan |
| AP1000 Material Standards and Material Specifications |
GI-AP1000-CE-03 GDA Issue |
GI-AP1000-CE-03
Resolution Plan |
| Fuel Handling Area – Secondary Containment Leak Detection and Collection System |
GI-AP1000-CE-04 GDA Issue |
GI-AP1000-CE-04
Resolution Plan |
| Probabilistic Safety Analysis (PSA) |
| Success Criteria for the PSA |
GI-AP1000-PSA-01 GDA Issue |
GI-AP1000-PSA-01
Resolution Plan |
| Fire PSA |
GI-AP1000-PSA-02 GDA Issue |
GI-AP1000-PSA-02
Resolution Plan |
| Fault Studies |
| Spent Fuel Pool Safety Case |
GI-AP1000-FS-01 GDA Issue |
GI-AP1000-FS-01
Resolution Plan |
| Design Reference Point and Adequacy of Design Basis Analysis |
GI-AP1000-FS-02 GDA Issue |
GI-AP1000-FS-02
Resolution Plan |
| Diversity for Frequent Faults |
GI-AP1000-FS-03 GDA Issue |
GI-AP1000-FS-03
Resolution Plan |
| Use of In-core Detectors to Protect Against Adverse Power Distributions |
GI-AP1000-FS-04 GDA Issue |
GI-AP1000-FS-04
Resolution Plan |
| Potential Enhancements to the Diverse Safety Injection System |
GI-AP1000-FS-05 GDA Issue |
GI-AP1000-FS-05
Resolution Plan |
| Validation of the IRWST Cooling Function for the PRHR |
GI-AP1000-FS-06 GDA Issue |
GI-AP1000-FS-06
Resolution Plan |
| Safety Case for Shutdown Faults |
GI-AP1000-FS-07 GDA Issue |
GI-AP1000-FS-07
Resolution Plan |
| Fault Schedule for AP1000 |
GI-AP1000-FS-08 GDA Issue |
GI-AP1000-FS-08
Resolution Plan |
| Control & Instrumentation |
| Adequacy of Safety Case for DAS |
GI-AP1000-CI-01 GDA Issue |
GI-AP1000-CI-01
Resolution Plan |
| DAS – Adequacy of Architecture |
GI-AP1000-CI-02 GDA Issue |
GI-AP1000-CI-02
Resolution Plan |
| Diversity Between the PMS (CIM) and DAS |
GI-AP1000-CI-03 GDA Issue |
GI-AP1000-CI-03
Resolution Plan |
| PMS Spurious Operation |
GI-AP1000-CI-04 GDA Issue |
GI-AP1000-CI-04
Resolution Plan |
| SMART Device Justification for Use |
GI-AP1000-CI-05 GDA Issue |
GI-AP1000-CI-05
Resolution Plan |
| Ovation Platform - Adequacy of Safety Case |
GI-AP1000-CI-06 GDA Issue |
GI-AP1000-CI-06
Resolution Plan |
| DCIS - Adequacy of Safety Case |
GI-AP1000-CI-07 GDA Issue |
GI-AP1000-CI-07
Resolution Plan |
| PMS - Adequacy of Safety Case |
GI-AP1000-CI-08 GDA Issue |
GI-AP1000-CI-08
Resolution Plan |
| CIM - Adequacy of Safety Case |
GI-AP1000-CI-09 GDA Issue |
GI-AP1000-CI-09
Resolution Plan |
| Class 1 Displays and Controls |
GI-AP1000-CI-010 GDA Issue |
GI-AP1000-CI-010
Resolution Plan |
| Essential Electrical Systems |
| PCSR Presentation of Claims Arguments and Evidence |
GI-AP1000-EE-01 GDA Issue |
GI-AP1000-EE-01
Resolution Plan |
| Fuel Design |
| Fuel Pin Modelling Safety Justification |
GI-AP1000-FD-01 GDA Issue |
GI-AP1000-FD-01
Resolution Plan |
| Tolerability of Depressurisation Forces in LBLOCA |
GI-AP1000-FD-02 GDA Issue |
GI-AP1000-FD-02
Resolution Plan |
| Use of the BEACON Code for On-line Compliance |
GI-AP1000-FD-03 GDA Issue |
GI-AP1000-FD-03
Resolution Plan |
| Reactor Chemistry |
| Accident Source Terms |
GI-AP1000-RC-01 GDA Issue |
GI-AP1000-RC-01
Resolution Plan |
| Primary Sampling System |
GI-AP1000-RC-02 GDA Issue |
GI-AP1000-RC-02
Resolution Plan |
| Hydrogen Dosing System |
GI-AP1000-RC-03 GDA Issue |
GI-AP1000-RC-03
Resolution Plan |
| Radiation Protection |
| Spent Fuel Pool – Criticality Safety Case |
GI-AP1000-RP-01 GDA Issue |
GI-AP1000-RP-01
Resolution Plan |
| Mechanical Engineering |
| Squib Valve Concept and Design Substantiation |
GI-AP1000-ME-01 GDA Issue |
GI-AP1000-ME-01
Resolution Plan |
| Metrication of Mechanical Equipment and Civil Structural Steelwork Connections |
GI-AP1000-ME-02 GDA Issue |
GI-AP1000-ME-02
Resolution Plan |
| Mechanical System Pipework Design |
GI-AP1000-ME-03 GDA Issue |
GI-AP1000-ME-03
Resolution Plan |
| Structural Integrity |
| Avoidance of Fracture |
GI-AP1000-SI-01 GDA Issue |
GI-AP1000-SI-01
Resolution Plan |
| Fatigue Analysis |
GI-AP1000-SI-02 GDA Issue |
GI-AP1000-SI-02
Resolution Plan |
| Reactor Coolant Pump |
GI-AP1000-SI-03 GDA Issue |
GI-AP1000-SI-03
Resolution Plan |
| Containment Vessel |
GI-AP1000-SI-04 GDA Issue |
GI-AP1000-SI-04
Resolution Plan |
| Compliance of AP1000 Main Structural Components with ASME III Design Rules |
GI-AP1000-SI-05 GDA Issue |
GI-AP1000-SI-05
Resolution Plan |
| Categorisation and Classification |
GI-AP1000-SI-06 GDA Issue |
GI-AP1000-SI-06
Resolution Plan |
| Human Factors |
| Completeness of the HF Safety Case |
GI-AP1000-HF-01 GDA Issue |
GI-AP1000-HF-01
Resolution Plan |
| Cross-Cutting |
| Limits and Conditions |
GI-AP1000-CC-01 GDA Issue |
GI-AP1000-CC-01
Resolution Plan |
| PCSR to Support GDA |
GI-AP1000-CC-02 GDA Issue |
GI-AP1000-CC-02
Resolution Plan |
| Consider and Action Plans to Address the Lessons Learnt from the Fukushima Event |
GI-AP1000-CC-03 GDA Issue |
GI-AP1000-CC-03 Resolution Plan |