Office for Nuclear Regulation
An agency of HSE

Project Assessment Reports (PARs) - 2011

PARs issued in 2011

Issued to all sites

Atomic Weapons Establishment (AWE) Burghfield [Nuclear Site Licence 78A]

Berkeley [Nuclear Site Licence 92]

Capenhurst (Urenco UK Ltd) [Nuclear Site Licence 48D]

LI no. Issued Title
N/A Q3/2011 Improvement notice for contraventions of contamination control arrangements
525 Q3/2011 Consent to a lease of land known as Plot H to Urenco ChemPlants Limited for the purpose of construction and operation of the Tails Management Facility
524 Q1/2011 The Nuclear Decommissioning Authority (NDA) wishes to grant a lease of Plot G at Capenhurst Nuclear Site, to Urenco UK Limited (UUK)
523 Q1/2011 The Nuclear Decommissioning Authority (NDA) wishes to grant a lease of Plot H at Capenhurst Nuclear Site, to Urenco UK Limited (UUK)
521 Q3/2011 Construction and Equipment Installation for the Tails Management Facility Uranium Oxide Store
519 Q3/2011 Consent to a lease of land to Urenco ChemPlants Limited for the purposes of construction and operation of the Tails Management Facility
517 Q1/2011 Consent to lease or Urenco UK Ltd Building 805 to NDA and for subsequent underlease to Sellafield Ltd

Devonshire Dock Complex (Barrow) [Nuclear Site Licence 42B]

Devonport Royal Dockyard [Nuclear Site Licence 50B]

Dungeness A [Nuclear Site Licence 94]

Dungeness B [Nuclear Site Licence 61]

Hartlepool [Nuclear Site Licence 59]

Harwell [Nuclear Site Licence 84]

Heysham 1 and 2 [Nuclear Site Licence 60]

LI no. Issued Title
568 Q4/2011 Consent under Licence Condition 30(3) to start-up Reactor 7 following the 2011 periodic shutdown.
567 Q3/2011 Agreement to Installation of Bursting Discs for Reactor 7 in the Pre-Stressed Concrete Pressure Vessel Safety Relief Valve Filter Vessels
566 Q2/2011 Agreement to Implementation of the Essential Systems Outage Program (ESOP)
565 Q2/2011 HSE approval of amendments to Technical Specification Nuclear Safety Requirement (NSR) 2 to allow Robust Fuel to be loaded into the Heysham 1 Power Station reactors
563
564
Q2/2011 Permission to enter the oxygen injection systems installed at Heysham 2 into routine carbon removal operations
562 Q2/2011 HSE agreement to use of robust fuel at Heysham 1 power station
557 Q1/2011 Replacement of gas circulator speed trip units in the reactor safety circuits

Hinkley Point B [Nuclear Site Licence 62A]

Hunterston B [Nuclear Site Licence 13]

Magnox Limited

Oldbury [Nuclear Site Licence 57A]

Sellafield, Windscale and Calderhall (Sellafield Ltd) [Nuclear Site Licence 31G]

LI no. Issued Title
N/A Q4/2011 Acknowledgement regarding receipt of the safety documentation for an Overarching Strategy Paper to an existing plant
N/A Q3/2011 Pile Fuel Storage Pond (PFSP) Metal Fuel Pilot Project (MFPP)
821 Q3/2011 Requested acknowledgement from ONR, under LC 22(1), for safety documentation on the manual processing of Plutonium Contaminated Material (PCM) waste held in ageing facilities and its transport to modern stores
814 Q3/2011 Agreement to Implement Safety Documentation for Modification to an Existing Plant, WVP Line 3 Shield Doors
813 Q3/2011 Acknowledgement of receipt of safety documentation for control of organisational change in the Sellafield Ltd Decommissioning Directorate
812 Q4/2011 Overarching Strategy Paper that scopes the implementation of the modification to the Low Active Drain Segregation (LADS) Filter House
811 Q3/2011 Consent to Operate for the WVP Residue Export Facility
810 Q3/2011 Agreement to Commence Construction of the Concrete Superstructure for Pile Fuel Cladding Silo (PFCS)
809 Q4/2011 Requested acknowledgement from ONR for safety documentation for the modification of Engineering Drums Stores (EDS) thought the installation and operation of a new drum waste assay suite
807 Q4/2011 Consent to a Licence to Occupy for PX Limited to operate, maintain and manage the Fellside Combined Heat and Power Plant at the Sellafield site
806 Q2/2011 Acknowledgement of receipt of plant modification proposal Overarching Strategy Paper for a trial of Trino fuel reprocessing in THORP 
805 Q1/2011 Sellafield Mox Plant: acknowledgement of receipt of plant modification proposal Overarching Strategy Paper for a new rod line (NRL)
803 Q2/2011 Acknowledgement of receipt of the Overarching Strategy Paper for the proposed Substation 6 & 7 replacement work
802 & 804 Q2/2011 Acknowledgement of receipt of the Overarching Strategy Paper for the decommissioning of Laboratories 194/5 within the Analytical Services Building & the Plant Modification Proposal (PMP) associated with the Lab 195 containment installation and glove-box dismantling operations
801 Q2/2011 Acknowledgement of safety case for modifications of engineered interlocks on the Flask Maintenance Facility
800 Q2/2011 Notification requiring consent prior to commencement of operations of the Sellafield Product and Residue Store (SPRS)
799 Q2/2011 Agreement to commence Stage 3 of Operability and Maintainability Trials of Phase 4 Active Commissioning of the Waste Treatment Complex (WTC)
797 Q1/2011 Agreement to construct gantry at Evaporator D
796 Q1/2011 Formal agreement sought to commence construction, installation and inactive commissioning of the Box Transfer Facility (BTF) in January 2011
788 Q3/2011 Agreement to Implement Safety Documentation for Modification to an Existing Plant - HA Plant Wash Operations

Sellafield, Windscale [Nuclear Site Licence 83]

Sizewell A [Nuclear Site Licence 96]

Sizewell B [Nuclear Site Licence 63]

Torness [Nuclear Site Licence 14]

Trawsfynydd [Nuclear Site Licence 81]

Wylfa [Nuclear Site Licence 58A]

Previous years


Directgov - Business Link

Updated 27.03.12